Prince George County |
Code of Ordinances |
Chapter 90. ZONING |
Article XV. FLOODPLAIN |
Division 2. DISTRICT PROVISIONS |
§ 90-725. Permit and application requirements.
(a)
Permit requirement. All uses, activities, and development occurring within any floodplain district, including placement of manufactured homes, shall be undertaken only upon the issuance of a zoning permit. Such development shall be undertaken only in strict compliance with the provisions of this ordinance and with all other applicable codes and ordinances, as amended, such as the Virginia Uniform Statewide Building Code (VA USBC) and the County of Prince George Subdivision Ordinance requirements. Prior to the issuance of any such permit, the floodplain administrator shall require all applications to include compliance with all applicable state and federal laws and shall review all sites to ensure they are reasonably safe from flooding. Under no circumstances shall any use, activity, and/or development adversely affect the capacity of the channels or floodways of any watercourse, drainage ditch, or any other drainage facility or system.
(b)
Site plans and permit applications. All applications for development within any floodplain district and all building permits issued for the floodplain shall incorporate the following information:
(1)
The elevation of the base flood at the site.
(2)
The elevation of the lowest floor, including the basement or, in V zones, the lowest horizontal structural member.
(3)
For structures to be flood-proofed, nonresidential only, the elevation to which the structure will be flood-proofed.
(4)
Topographic information showing existing and proposed ground elevations.
(Ord. No. O-12-07, 4-24-2012)
(Ord. No. O-12-07, 4-24-2012)